On December 27, 2019, the project received a loan of RMB 69.5 million and was guaranteed by Industrial Bank Fuzhou Branch

The project, which belongs to the category of energy saving and energy efficiency improvement, is about constructing 2,000 public charging piles in Fujian Province. By building charging piles to charge electric vehicles and replacing oil-fueled vehicles with electric ones, the project can thereby realize the objective of reducing greenhouse gas emissions. It’s expected that averagely 7,269 tCO2e of carbon dioxide emission can be reduced on annual basis.