current position :Guangdong

Yudean Zhongshan Triangle Natural Gas Cogeneration Project of Guangdong Yudean Zhongshan Thermal Power Plant Co., Ltd.

2019-09-10

The project was approved concessional loan of RMB 69 million on August 30 2019 and guaranteed by Guangdong Yudean Finance Co., Ltd..

The major construction of three 486MW (F-class) gas-steam combined cycle cogeneration units, and supporting thermal grid engineeringand heavy-lift terminal engineering.The project is about energy conservation and energy efficiency enhancement. By adopting a low-emission natural gas fuel to achieve cogeneration, the project helps reduce greenhouse gas emissions.When the project is finished, it is estimated that the annual power generation will be 7.516 million MWh and the heat supply will be 13.7 million GJ.And it’s estimated that 1,026,994 tCO2e of greenhouse gas can be reduced annually.

From :

Author: Page Views : 262