current position :Inner Mongolia

Inner Mongolia: Erguena City Central Heating Project by Erguena City Xing Tong Heating Co., Ltd.

2017-12-13

The project was granted concessional loan of RMB 68 million by China CDM Fund on December 4 of 2017. It mainly includes installing 4 sets of 58MW circulating fluidized bed boilers and 8 heat exchange stations and 19.5km ancillary heating-supply pipelines. The project belongs to energy saving and efficiency improving. By establishing the central heating source to replace the inefficient small boilers in the area, it can improve energy efficiency and reduce fuel consumption, and thus lower greenhouse gas emission. Once put into operation, the project will reduce greenhouse gas emission by 3,167tCO2e annually and lever private capital of RMB 181.7147 million.

From :

Author: Page Views : 217

Contact Us  |  Join us | Links | Site Map

Website

Wechat