Emaozhai 120MW Agriculture-PV Complementary Project Phase III of Panzhou Shengyousheng New Energy Co., Ltd. in Guizhou
The main component of the project is to construct a 120-megawatt agriculture-PV complementary photovoltaic power station including construction of photovoltaic arrays in photovoltaic fields, booster stations, and 35kV transmission lines.
发起时间:2020/04/16
Pacemaker No.1 100MWp Photovoltaic Project of TBEA Sunoasis Co., Ltd and Baotou Guangyi Solar Power Generation Company Limited
The main component of the project is to build up a photovoltaic station with an installed capacity of 100MW, including component and inverter installation and line installation, etc.
发起时间:2020/04/16
TBEA Chongren County Xiangshan Town 50MW Wind Power Generation Project Phrase I of TBEA Sunoasis Co., Ltd
The main component of the project is to build up wind farm with a total installed capacity of 50MW, including the installation of 18 wind turbines and related supporting engineering.
发起时间:2020/04/16
2×104Nm3/d Biological Natural Gas and Organic Fertilizer Ecological Recycling Project of Shanxi Shenmu New Energy Co., Ltd.
The main component of the project is to build pretreatment workshop, anaerobic fermentation tank, purification workshop, fertilizer production workshop, and office and supporting public facilities.
发起时间:2020/03/27
Central Heating (Cooling) System BOT Project in the Campus of Nanjing University of Information Science & Technology of Beijing Gas Energy Development
?The main component of the project is constructing 5 energy station systems, as well as outdoor pipelines and heating and domestic hot water end in the campus.
发起时间:2020/03/27
New Energy Bus Procurement Project Phase (Ⅲ) of Hangzhou Public Transport Group Co., Ltd.
The main component of the project is to purchase 360 pure electric buses which are 12-meter-longto replace some of the buses for the trunk lines.
发起时间:2020/03/10
New Energy Bus Procurement Project Phase (II) of Hangzhou Public Transport Group Co., Ltd.
The main component of the project is to purchase 350 pure electric buses, including 160 buses which are 10-meter-long and 190 buses which are 12-meter-long, to replace some of the buses for the trunk lines.
发起时间:2020/03/10
Unit Capacity Expansion and Energy Saving Emission Reconstruction Phase II Project of Inner Mongolia Daihai Electric Power Generation Co. Ltd.
The main component of the project is to increase the capacity of Unit 3 and Unit 4 from 600 MW to 660 MW, and to transform the steam turbine circulation part, the heating surface of the boiler, the four major pipelines and the combined heat recovery of fl
发起时间:2020/03/10
Anyang City Household Waste Incineration Power Generation Project of City Development Environmental Energy (Anyang) Co., Ltd.
The main component of the project is to build new waste reception and pretreatment system, a waste incineration system, an ash and slag treatment system, a turbine power generation and heating system, a flue gas purification system, a salt water removal s
发起时间:2020/03/10
Hua County Jingmai Industrial Park Waste Incineration Power Generation Project of City Development Environmental Energy (Hua County) Co., Ltd.
The main component of the project is to build 2 new waste incineration treatment lines with daily capacity of 500 tons and 2 sets of 10 MW condensing steam turbine generator unit with related plants and supporting production facilities.
发起时间:2020/03/10
«