current position :Inner Mongolia

Unit Capacity Expansion and Energy Saving Emission Reconstruction Phase II Project of Inner Mongolia Daihai Electric Power Generation Co. Ltd.

2020-03-10

On March 2, 2020, the project was approved with the China CDM Fund concessional loan of RMB 69 million, guaranteed by the Hohhot Branch of Industrial Bank.

The main component of the project is to increase the capacity of Unit 3 and Unit 4 from 600 MW to 660 MW, and to transform the steam turbine circulation part, the heating surface of the boiler, the four major pipelines and the combined heat recovery of flue water. When the project is completed, it is estimated that it can generate additional electricity of 585 million kWh annually. The project belongs to the category of energy-saving and energy efficiency enhancement. By improving energy-saving technology, increasing power generation, and reducing pollutant emissions, the project can realize greenhouse gas emissions reduction.

image.png

From :

Author: Page Views : 249

Contact Us  |  Join us | Links | Site Map

Website

Wechat